Fleets Corner
Avon Construction were awarded the sub contract to deliver the groundworks for the construction of a new Selco Unit at Fleets Corner.
During this project we:
Constructed the piling mat, foundation pads and beams
Installed new foul and surface water drainage including a 220m3 attenuation tank and bypass separator
Installed a 3,375m2 power floated internal floor slab and a 2,000m2 brush
Constructed a reinforced concrete gas protection slab over the gas mains for the access road.
Laid over 1.2km of edgings, kerbs, drainage kerbs and Trief kerbs.
Install over 500m of ducting and inspection chambers.
Built gabion basket retaining walls.
All the work was successfully delivered on time and to budget.