Hartland Village Bridge
We are delighted to have completed the prestigious Hartland Village Entrance Bridge for St Edward Homes Ltd.
It was a design and build project to the value of £1.2m, with a contract duration of 6 months.
The main components of the build included reinforced concrete piles and foundations; precast concrete arches and walls; foam concrete infill over the arches; reinforced concrete bridge deck; block paving road construction; brick cladding and piers; copers; railings and lamp posts.