Netherhay Lane Drainage
The design and build drainage package for South West Water to carry out a new foul water connection from a new-build housing development in Drimpton, to an existing combined sewer network.
Contracted works included: Drainage design, Traffic Management, Construction of 3no. 1200mm diameter manholes, 701m of foul drainage ranging from 1.2m - 2.1m deep, Ecological, environmental and archaeological considerations, CCTV survey and jetting.
All excavations were undertaken using trench support. Works constructed in accordance with specification for highways works drainage design.
Works were successfully completed on time allowing the house developer to commence the sale of their new builds.