Ringwood Oil Depot
We have successfully completed the external works package for Wessex Petroleum Group to improve the Ringwood depots drainage and hardstanding facilities to bring it in order with Environment Agency standards.
Key elements of work included the installation of a 15,000ltr petrol interceptor and associated pipework, installation of 200mm of Aco drainage channels, installation of a 55,000ltr underground attenuation tank and design, co-ordination and installation of all required temporary works.
Hardstanding improvements included removal and shaping of the existing hardstanding, off-site disposal of over 500t of contaminated material and casting of a 1400m2 of reinforced concrete slab, 235mm thick.